The Configuration Challenge
Complex Ecosystem: Navis A4/N4 upgrades involve hundreds of configurations across N4/A4, XPS, and Database layers — all of which must align perfectly post-upgrade.
Time-Consuming Manual Steps: Each environment (Test, Staging, Production) requires repetitive configuration, verification, and validation — increasing testing cycles and operational delays.
Error-Prone Processes: Manual configuration increases the risk of missing settings, data mismatches, or inconsistent parameters across clusters.
High Downtime Risk: In a 24×7 operational environment, configuration delays directly affect terminal productivity and go-live schedules.
    
    
              Ping Us